2008 BEST OF COMPETITION (GOLD) OVERALL INTERIOR - WEST REGION Cottonwood Church, Los Alamitos, California
Other CISCA Members Involved with Project:
John Jory Corp.
Architect / Specifier: Kroh/Broeske Architects
The Cottonwood Church project is a fine example of blending various materials and systems together into one large space to create an exciting and leasing worship environment. Both ceiling and wall systems are designed and installed in such a way as to create look of much larger components.
Most importantly, the selection of Environwood faux woodgrain finish allowed the project to come in on budget and on schedule. The rich, satisfying appearance of wood was achieved without breaking the budget.
AWARDED TO ACCENT CEILINGS AND WALLS
2008 BEST OF COMPETITION (GOLD)
RESTORATION/RENOVATION - WEST REGION Century Plaza Towers Capital, Los Angeles, California
Other CISCA Members Involved with Project: Martin Integrated
Architect/Specifier: Keating/Khang Architecture
The renovation of the towers is a prime example of a successful collaboration among not only the installation crews on the job site, but also the manufacturers of all the various types of custom materials required. Close communication and coordination with all parties resulted in a very successful project.
The two identical 20-story, triangular shaped towers seemed to have new and exciting challenges every day.
2008 BEST OF COMPETITION (GOLD) RESTORATION/RENOVATION CENTRAL REGION Union Pacific Harriman Dispatch Center, Omaha, Nebraska
Submitted by: alewitch Construction Services, Inc.
Other CISCA Members Involved with Project: Accent Ceilings and Walls; Architectural Components Group, Inc.; Fry Reglet Armstrong; Sound Concepts
Architect/Specifier: DLR Group
This project illustrates artistic vision and functional design of specialty materials brought together by architectural imagination and skilled, professional craftsmanship.
This project was considered a “crown jewel” facility for the Union Pacific Railroad. As a result, a keen and critical eye for quality of material and craftsmanship was constantly maintained.
AWARDED TO ACCENT CEILINGS AND WALLS
2007 BEST OF COMPETITION (GOLD) OVERALL INTERIOR CENTRAL REGION The Children's Hopital, Denver, Colorado
Other CISCA Members Involved with Project: 9Wood
Architect/Specifier: Zimmer Gunsul Frasca Architects
The renovation Denver’s new $550 million pediatric hospital was designed to be filled with light, color, imagination and confidence. A dynamic triangular layout was conceived, the geometry starting from the outside gardens and accented inside with bays marked off by metal light and diffuser troughs.
Tight physical tolerances were matched by the tight collaborative tolerances needed to bring different manufacturer’s together to create one, unified and integrated ceiling.